Alpha Insulation and Waterproofing Alpha Insulation and Waterproofing

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Bartlett Cocke, LP back to client list >>
Featured Projects
Browse Other Projects
FBISD Armstrong ElementaryFBISD Armstrong Elementary
Missouri City, TX

The FBISD Armstrong Elementary is an 80,000 sq. ft. elementary school built for Fort Bend County Independent School District. Alpha provided services for the installation of the bituminous damp proofing, flashing, and extruded polystyrene insulation at the exterior cavity walls. This work was meticulously sequenced with Bartlett Cocke and the stucco contractor because Alpha was also responsible for the framing that the lath and extruded polystyrene was to be mounted on. Alpha also installed multiple types of joint sealants to the exterior and interior of the building along with sheet membrane waterproofing at the elevator pits and shower pans.
New University High SchoolNew University High School
Waco, TX

Bartlett Cocke started construction in early 2009 on this $70 million, 350,000 square foot high school for the Waco Independent School District. The new high school will replace the current University High School located on Bagby Avenue. Alpha was contracted by Bartlett Cocke to install the spray applied fireproofing. Over 12,000 bags of cementitious fireproofing were applied to the floors, roofs and columns on this project to achieve the required fire resistive ratings.
TSU Student Recreation CenterTSU Student Recreation Center
San Marcos, TX

Located on the campus of Texas State University in San Marcos, Texas this 94,000 square foot recreation center opened in 2009 and totaled $24 million in construction costs. The first level of this facility holds a fitness center with a gymnasium above located on the second floor. The third level is open to below with gallery space and views down into the gymnasium. Alpha teamed up with Bartlett Cocke, LP to provide the sheet membrane waterproofing at all below grade walls and elevator pits, spray applied air & vapor barrier and extruded polystyrene insulation as part of the exterior wall cavity system, crystalline waterproofing of the swimming pool, thru wall flashing and joint sealants of the exterior masonry and stucco facades.
William J. Brennan High SchoolWilliam J. Brennan High School
San Antonio, TX

The William J. Brennan High School is located in Northwest San Antonio and is the 10th high school of the Northside Independent School district, the city's largest school district. Alpha performed spray applied cementitious fireproofing and intumescent fireproofing for Bartlett Cocke, L.P. in the vocational classroom areas.
Browse Other Projects
© 2014 Alpha Insulation and Waterproofing