Alpha Insulation and Waterproofing Alpha Insulation and Waterproofing

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Joeris Construction back to client list >>
Featured Projects
Browse Other Projects
Boerne Greyhound HS Addition & Ren.Boerne Greyhound HS Addition & Ren.
Boerne, TX

This project consisted of a $22 million addition and renovations to the original high school built in 1972. The new 1,250 student facility is comprised of a new library, six state-of-the-art science classrooms/labs, administrative offices, 400-student capacity cafeteria, kitchen, vocational areas and includes the remodel to athletic and fine arts facilities. Alpha provided Joeris with damp proofing, flashing and rigid foam board insulation in the exterior masonry wall cavity. In addition Alpha provide sealants and water repellents at the exterior masonry veneers and firestop systems at the interior rated partitions.
NEISD Heroes StadiumNEISD Heroes Stadium
San Antonio, TX

Located on 58 acres in an old abandoned quarry in northern San Antonio area, NEISD Heroes Stadium is a $33 million, 10,000-seat athletic stadium equipped with a state-of-the-art press box and double deck stands on both sides of the playing field. This facility will provide a superior venue for the student athletes of the Northeast Independent School District of San Antonio including locker rooms, concession stands, public restrooms and more than 2,500 parking spaces. Joeris contracted Alpha to provide the sheet membrane waterproofing at the below grade concrete walls as well as on the horizontal decks at the field level and at the Press Box. In addition Alpha provided damp proofing, membrane flashing and joint sealants at the exterior wall facade and site sealants at the concrete site work.
Browse Other Projects
© 2014 Alpha Insulation and Waterproofing