Alpha Insulation and Waterproofing Alpha Insulation and Waterproofing

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Hardin Construction Company back to client list >>
Featured Projects
Browse Other Projects
Cobb Energy Performing Arts CentreCobb Energy Performing Arts Centre
Atlanta, GA

The Cobb Energy Performing Arts Centre is the first major performing arts facility built in metro Atlanta in four decades. The Cobb Energy Centre is a premier venue for Broadway shows, ballet, concerts, educational shows, family performances, opera, corporate meetings and events. Hardin Construction completed the project on time and under-budget, a remarkable feat in the construction of world class performance venues. The facility includes the 2,750 seat John A. Williams Theatre, ballrooms, courtyards and terraces, a 700-space parking deck, as well as full service food and beverage capabilities. Hardin partnered with Alpha on the very difficult below grade waterproofing systems, the high performance air and vapor barrier systems, interior and exterior rated and non rated sealants, as well as spray fireproofing.
Houston Premium OutletsHouston Premium Outlets
Fairfield, TX

The Houston Premium Outlets consists of 165 acres of site work development; 475,000 sq. ft. open air retail center with food court, fountain and play areas. It included the construction of an expansion to the TXDOT feeder road and country roads, and added a new on/off ramp to the adjacent highway. The mall itself consists of a 16 building outlet mall in Fairfield Texas. Alpha provided the services of installation of exterior building sealants, site sealants, and the fire rated joint sealants between retail spaces
RBC Plaza - TowerRBC Plaza - Tower
Raleigh, NC

Located in downtown Raleigh, NC, this 757,000 square foot, 33-story high rise tower, consists of lobby, retail service core, office levels, condominium levels, and parking deck. Alpha provided materials and installation services for the Hot Applied Waterproofing system upon the plaza areas, elastomeric coatings to the exterior facade and several types of sealants and caulking for weatherproofing the building. The key to success for this project completion was developing a new relationship with the General Contractor Team and communicating expectations and technical assistance to the project team to allow Alpha to execute its tasks on time and on budget - safely.
Round Rock Premium OutletsRound Rock Premium Outlets
Round Rock, TX

Located just north of Austin, this 470,000 S.F open-air retail shopping center consists of over 125 high end stores, food court, a decorative hardscape promenade, fountain and play areas. With over 200 acres of site development, Alpha was called on by Hardin Construction to complete all the building sealants and site work caulking throughout the entire project, as well as fire protection sealant and concrete floor sealer in the common areas. In addition, Alpha simultaneously worked to complete the sealant work at all storefronts through another subcontractor onsite making this a single source weather seal project performing over 150,000 linear foot of sealant by completion.
The Paramount at Lake EolaThe Paramount at Lake Eola
Orlando, FL

The Paramount at Lake Eola is a 16 story, Art Deco, luxury condominium project in downtown Orlando that was completed in 2008. The $125 million project includes a 6 level parking garage, a Publix Supermarket, fitness center, and a 15,000 SF resort style pool with a spa and private cabanas. Alpha Insulation and Waterproofing was contracted to provide a complete waterproofing scope, including balcony and vehicular traffic coating, caulking, spray fireproofing, and over 100,000 SF of below grade waterproofing.
Browse Other Projects
© 2014 Alpha Insulation and Waterproofing