Alpha Insulation and Waterproofing Alpha Insulation and Waterproofing

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Charter Builders, Inc. back to client list >>
Featured Projects
Browse Other Projects
Burleson High SchoolBurleson High School
Burleson, TX

At 547,550 sq ft, the New Burleson High School #2 is one of the largest high schools in Texas. The facility sits on a 152-acre site and will accommodate 2,000 ninth through 12th grade students. Charter Builders, Inc. contracted with Alpha Insulation and Waterproofing to install over 15,000 bags of spray-applied fireproofing, intumescent fireproofing on exposed architectural steel, below-grade waterproofing, joint sealants, water repellents and concrete floor sealer. The project is scheduled for completion in time for the start of the 2010-2011 school year.
Cotton Bowl Pkg. 3BCotton Bowl Pkg. 3B
Dallas, TX

This recent renovation was the biggest transformation in the Cotton Bowl's 78-year history, a $57 million upgrade that added more than 16,000 seats to its end zones, finishing out the ends of its oval bowl with upper-level decks and bringing its total capacity to 92,200. The changes include two contiguous concourses around the stadium, refurbished entryways with four new stairwells, 25 new bathrooms and concession stands that will provide shorter waits. Charter Builders contracted with Alpha Insulation and Waterproofing to provide all of the below-grade fluid applied waterproofing, sealed concrete, joint sealants, damp proofing and spray applied fireproofing on the renovation.
Falls Career/Admin ConversionFalls Career/Admin Conversion
Marble Falls, TX

Located in Marble Falls, Texas, this 40,500 sq. ft. renovation involved the existing Colt Elementary School, which was converted into the new Falls Career campus and New Administration offices and board room. The majority of the work consisted of interior renovations to accommodate new offices, classrooms and the Community Boardroom to house meetings for Marble Falls Independent School District. Alpha was requested by Charter Builders and Marble Falls ISD to perform the spray polyurethane foam insulation scope on the exterior wall cavities of this renovation project.
Browse Other Projects
© 2014 Alpha Insulation and Waterproofing